Park City Blog

Catch up on the latest updates, tips and more.

Happy new Pinecone year it is!!

Okay, here's what's up:

The storm was good to us; 2 feet of snow in 48 hours and the wind loaded things in so it skied like much more. My control laps in Jupiter and the East Face the last couple days have been full of face-shots (pictures will follow once I get them off my camera). It was good to hear all the happy locals and visitors out there enjoying things too. We have a couple days of sunny, stable weather and a chance to catch up on things.

INCLUDED in that will be a mission to Upper Pinecone tomorrow morning (Tuesday, New Year's Day). Conditions permitting, we will do our best to get Pinecone Bowl through Two Goons open for you by late morning. The avalanche control gate will be CLOSED at North Two Goons. We are not doing any control work past that point so PLEASE, enjoy the open terrain and obey our closures. Remember, we close things to protect you.

Alpine Coaster

Glide through aspen glades on an elevated alpine slide track full of curves, bends and loops.

Mtn Biking & Hiking

Park City's abundant selection of hiking and mountain biking trails are great for all skill levels.

Alpine Slide

Park City Mountain Resort's Alpine Slide is one of the longest slides in the world.

Summer Activities Report

See the status of our summer adventures.

Summer Combo Tickets

Enjoy a single ride on two or three of our most popular adventures.

Summer Rates

Park City Mountain Resort Summer 2013 activity rates.

Resort Dining

We’ve got your cravings covered.

Season Pass Sales

My Pass. My Way. You build your own Season Pass with the options that are right for you.